Service Request

Exceptional Service for Your Concrete Floor Coating

Whether you are a returning client or a new referral, Pinnacle Concrete Coatings is proud to provide exceptional solutions for concrete floors in Salisbury, MD, and other areas on Delmarva. Our industrial-grade coatings are engineered for unmatched durability and a lifetime of beauty. We are also committed to providing stellar results with an unparalleled customer experience on every project.

Please use the form below to request follow-up service on your concrete coating or if you were referred to us.

Pre-Installation Tips

Preparing your space is vital for a seamless one-day installation:

Clear the Area:

Remove all items from the garage, ensuring the area is clean and empty for the installers.

Clear 2 Feet Above Floor:

Keep walls clear at least 2 feet above the floor for equipment operation.

Stop Parking Inside:

Avoid parking on the floor the night before installation to prevent moisture buildup from snow or AC units.

Paint First:

Perform any painting of walls or ceilings before the coating is applied.

Do not wash the floor:

Don’t hose or wash the floor before we arrive.

Remove Moisture-Retaining Objects:

Remove rugs, planters, and anything that will hold moisture in the concrete as soon as possible.

Disable Sprinkler System:

If you have a sprinkler system, ensure that it is turned off at least 3 days and remains off until past the cure time.

Pre-Installation Tips

Preparing your space is vital for a seamless one-day installation:

Clear the Area:

Remove all items from the garage, ensuring the area is clean and empty for the installers.

Clear 2 Feet Above Floor:

Keep walls clear at least 2 feet above the floor for equipment operation.

Stop Parking Inside:

Avoid parking on the floor the night before installation to prevent moisture buildup from snow or AC units.

Paint First:

Perform any painting of walls or ceilings before the coating is applied.

Do not wash the floor:

Don’t hose or wash the floor before we arrive.

Remove Moisture-Retaining Objects:

Remove rugs, planters, and anything that will hold moisture in the concrete as soon as possible.

Disable Sprinkler System:

If you have a sprinkler system, ensure that it is turned off at least 3 days and remains off until past the cure time.

Best Practices for Concrete Floors

To ensure your premium floor remains in pristine condition, please take note of these essential post-installation guidelines:

Do’s

  • Wait to Walk/Drive:

    Allow at least 6-8 hours before walking on the floor (next morning is best) and 24 hours before driving on it.

  • Wait for Full Cure:

    Wait 36-48 hours before driving on the floor for best results, and 72 hours for full chemical resistance.

  • Keep Ventilated:

    Keep your garage door open until the morning following installation for proper curing.

  • Regular Cleaning:

    Sweep or use a microfiber mop regularly to remove sand, salt, and debris, which can act like sandpaper over time.

  • Use Proper Cleaners:

    Use simple cleaners like Dawn dish soap, Simple Green, Pine-Sol, or CLR.

  • Use a Squeegee:

    A squeegee is highly effective for removing water and preventing spots.

  • Protect the Surface:

    Use felt pads under furniture/equipment and mats under motorcycle kickstands.

Don’ts

  • Avoid Harsh Cleaners:

    Do not use acids, bleach, ammonia, or citrus-based cleaners, as they can degrade the coating.

  • Avoid Abrasives:

    Do not use stiff-bristle brushes or abrasive cleaning pads, which can scratch the finish.

  • No Steam Cleaners:

    Avoid using steam cleaners, as high heat/pressure can damage the coating.

  • Do Not Drag Heavy Items:

    Avoid dragging heavy equipment or furniture, which can cause scratches or gouges.

  • Avoid Long-Term Chemical Exposure:

    Clean up oil, grease, or chemicals promptly to avoid potential long-term damage or staining.

  • Do Not Park Immediately:

    Avoid driving or parking on the floor for at least 24 hours post-installation.

Maintenance Tips

Maintaining the luster of your Pinnacle floor is simple with regular care:

Deep Cleaning:

For a deeper clean, mix a mild cleaner with warm water, let it sit for 5-10 minutes, scrub with a soft brush, and rinse.

Recommended Cleaner:

Ask us about Penntek’s LGX-501 cleaner, designed specifically for these floors.

Frequency:

Regular sweeping and occasional rinsing are usually sufficient to maintain the floor’s appearance.